Standing seam systems:
Warm (cellular glass)
Warm (mineral wool/PIR)
Warm (composite panels)

Ventilated (roof boarding)
Ventilated roof (incompatible support)


Training and work site support: Technical support for roofers through practical courses and advice at the start-up of work on the site. Click here for more information.

VM ZINC® Technical and Sales Support Manager: Advises architects, roofing contractors and dealers.

Project Support Office: In the context of projects, assists designers and roofing contractors through technical studies, construction plan details, advice and recommen-dations and finding innovative solutions. Click here for more information.




Website Umicore
 
Roofing systems
Facade systems
Rainwater System D gutters
Rainwater System P gutters
Ornaments

















This website technical and commercial contents applies exclusively to the specification and installation of the designated products or systems on building sites in United Kingdom and the Republic of Ireland. For all other countries please consult vmzinc.com.

Feel free to choose any form our aspect
 
 
Standing seam Print E-mail

Ventilated roof on roof boarding

  • Roofs with a pitch from 3° to vertical
  • Both renovations and new buildings
  • Installation on the roof boarding or incompatible support
  • Transformation, installation in sheets up to 13 m long, mechanical crimping
 
AREA OF APPLICATION

  • Roofs with a pitch from 3° to vertical
  • Classes of internal humidity load: 1 to 4.
  • Both renovations and new buildings.
 


VMZINC, the choices


Characteristics of this technique

Standing seam - Natural VM ZINC - College, Mirecourt (France) - HQE building

  • VMZINC is installed on the roof boarding.
  • A 40 mm continuous air gap must be left clear beneath the roof boarding, on all the roof pitches.
  • Continuous ventilation openings are made at the top and bottom.
  • In order to keep the integrity of the roof, it is recommended to install a breather membrane on the cold side of the insulation and a vapour control layer adapted to the internal humidity load of the building, on the warm side of the insulation.
 

Structure

  • Clean and dry 100 to 150 mm wide, 18 or 24 mm thick softwood boarding, according to the rafter centres.
  • Any wood treatment products (fungicides, insecticides) must be dry and completely neutral in relation to VMZINC.
  • The roof boards are fixed perpendicular to the direction of the pitch leaving a 3 to 5 mm gap between them.
    They are securely fixed to the structure.
  • Maximum difference in height of 1 mm between roof boards.
    The deflection measured under a rigid 600 mm long straight edge cannot exceed 2 mm in all directions.
  • The roof board nails are countersunk in order to avoid any contact with the VMZINC.
  • In case of incompatible support (e.g. plywood), one should use only VMZINC PLUS.
 

 Composition of the roof
1. Interior finish
2. Vapour control layer
3. Insulation
4. Breather membrane (optional)
5. Ventilated air space
6. Rafter
7. Roof boarding (or incompatible support)
8. VMZINC standing seam
Image 

Image

Standing seam
Guidelines for specification and installation


Edition 06/2007 (83 pages)
Erratum 09/2007 (page n°19)
PDF File (6,4 Mo)

-- Download --


Click here to download freely technical drawings in DWG format (Autocad 2000 versions)
Click here to create the  technical specifications of your project.